Welcome to the Document Library. Here, you will find copies of all documents related to the development of the Wyseby Hill Energy Farm. We are committed to maintaining transparency, so this page will be regularly updated as the project progresses. We encourage you to check back frequently for the latest updates and information.

Proposal of Application Notice (September 2024)

Proposal of Application Notice (PoAN)

The Proposal of Application Notice (PoAN), submitted in August 2024, provides an overview of the proposed methods for community consultation as part of the development process. It outlines how the local community will be engaged through events, letters, and ongoing opportunities for feedback, ensuring that residents and stakeholders are fully informed and involved at every stage.

To learn more about the consultation approach and the project details, please click here to read the full report.

Note: In our original submission, the local MSP was incorrectly listed as John Cooper instead of Oliver Mundell. We promptly identified this inaccuracy and immediately informed the planning team. The correct Member of the Scottish Parliament, Oliver Mundell, was then invited to attend the consultation event to ensure accurate representation. We appreciate your understanding as we maintain our commitment to accuracy and transparency throughout this process.

Letter from Planning Authority – September 2024

The response to the Proposal of Application Notice (PoAN) acknowledges the notice submitted in August 2024 and outlines the requirements for community consultation. It confirms that the proposed public events and consultation activities are acceptable in terms of timing and location.

The response also recommends:

  • Establishing a dedicated website for those unable to attend events in person.
  • Involving all relevant community councils to ensure widespread engagement.
  • Preparing a Pre-Application Consultation (PAC) Report detailing how consultation feedback should be gathered and addressed.

For more details, please click here to access the full response.


Letter to Nearest Neighbours – Wyseby Hill Energy Farm Consultation (September 2024)

In September 2024, a letter was sent to the 200 nearest neighbours introducing the proposed Wyseby Hill Energy Farm. The letter provided details on the project, its benefits, and the ongoing consultation process. It outlined how the community can participate, including booking face-to-face meetings and attending events. The aim was to ensure that close neighbours have all the necessary information and opportunities to give feedback.


Councillor Meeting at The Smiths Hotel

On 19th September 2024, a meeting was held at Smiths Hotel where local councillors were invited to review the Wyseby Hill Energy Farm proposals and ask questions. Representatives from the Gretna, Springfield and Gretna Green Community Council, as well as Canonbie and Kirtlebridge, attended to gather information and discuss the plans in detail.

This meeting provided an opportunity for key community representatives to:

Prepare to inform their respective communities about the upcoming exhibition events.

Understand the development proposals.

Raise concerns and ask questions.


Advertising for the First Consultation Event (October 2024)

The documents below outline the methods of consultation planned for the first of four consultation events scheduled for October 2024. These materials provide a detailed overview of the approaches that will be used to engage with stakeholders and the wider community, ensuring that all relevant parties are informed and have the opportunity to participate in the process.

To support this, a press release has been sent to:

  • DNG Media
  • Dumfries and Galloway Council
  • Greatest Hits Radio
  • ITV News
  • BBC Local

Our aim is to foster an open dialogue, gather feedback, and ensure transparency as we progress through the initial stages of consultation.

Newspaper Articles

The upcoming consultation event has been advertised in the Dumfries and Galloway Standard to ensure local awareness and participation. The notice will be published on four dates:

The advertisement has been booked under the size specification of 12×2 and classified as “Other.” This proactive approach aims to maximise exposure across multiple publication dates, ensuring that the local community is well-informed about the event and encouraged to participate.

During the consultation, some local residents raised questions about the choice of newspaper used for advertising, noting that the selected publication may not be the most relevant for reaching all community members. Green Energy International (GEI) contacted all local media providers and received detailed information outlining the areas covered and key demographics of each outlet.

We recognise that the readership of the chosen newspaper may be broader than other publications, but we will take this feedback into account when selecting media outlets for advertising the remaining three consultation events. Our goal is to ensure that we reach as many local residents as possible and provide opportunities for everyone to participate in the consultation process.

Facebook Advertising

Adverts were launched on Facebook, targeting audiences within a 10-mile radius of Lockerbie, Scotland (Latitude 55.04, Longitude -3.12), reaching users aged 18 to 65+. The campaign was designed to run for two weeks leading up to the event to ensure maximum awareness and engagement from local residents.

This approach aimed to inform the community about the Wyseby Hill Energy Farm exhibition and encourage them to book a slot to learn more and provide feedback on the plans.



In the 11 days leading up to the first consultation event, a dedicated advert covering a ten-mile radius of the proposed site reached 7,244 people, with 36.1% women and 69.3% men. Of those reached, 531 individuals clicked on the booking link. In the two weeks preceding the event, the dedicated Facebook page attracted 3,428 visitors, with 9 people liking the page and 15 following it. During this period, 133 comments were posted in the group, accompanied by 11 shares and 54 reactions, demonstrating active community engagement leading up to the consultation.

Engaging Seldom-Heard Groups and Local Organisations

An email was sent to a range of seldom-heard groups, local organisations, and other relevant parties to inform them about the proposals for the Wyseby Hill Energy Farm. These included:

  • Dumfries & Galloway Hard of Hearing Group
  • International Women’s Group
  • Environmental Organisations
  • Local Primary Schools
  • Residential Care Homes

Each group was provided with:

Posters to be placed in prominent positions to enhance community awareness and engagement.

Detailed information about the consultation event.

A link to an online survey to ensure their voices could be heard in the planning process.

A5 Flyer Distribution to Local Residents

A double-sided A5 flyer was distributed to residents within Zone 2, up to 1 km away from the proposed site. The flyer was designed to arrive at least one week before the community exhibition, providing key details about the Wyseby Hill Energy Farm event, including:

  • Dates and Location of the event.
  • How to Book a Slot for attending.
  • Overview of the project and its benefits.

This targeted distribution ensured that those living closest to the proposed development were informed early and encouraged to attend and engage with the project plans.

In the lead-up to the consultation event, all 2,987 A5 flyers were successfully delivered, with nearly unanimous feedback confirming their arrival via Royal Mail. In the small number of cases where flyers were not received, it’s possible they may have accidentally been discarded. The QR code featured on the flyers was tested on both Apple and Google phones, and it worked successfully on all devices.


Wyseby Hill Energy Farm Consultation Event 1: 17th-18th October 2024

The first public consultation event for the Wysebyhill Energy Farm took place on 17th-18th October 2024 in one of the conference rooms at The Smiths Hotel, Gretna. With a total of between 140-200 attendees, including 70 bookings and three walk-ins, the event provided an opportunity for local residents to engage with the project team, ask questions, and share their views.

The event featured display boards, extra-large scale maps with zoomable content, and the option for attendees to complete surveys either online or on paper. Maps were also provided for attendees to take away. Each member of the project team was allocated a booking throughout the day, ensuring everyone had the opportunity to ask questions and engage in meaningful discussions.

Feedback from the event was mixed, and many questions were raised, highlighting the community’s interest and concerns about the project. Below, you will find all the documents and plans that were available at the event, downloadable as PDFs. Answers to the key questions raised will be provided at the next consultation event, scheduled for Spring 2024.

Feedback/Concerns Raised:

  • Local Economy: Interest in creating job opportunities by having on-site cabins for workers, supported by local businesses providing food.
  • Farming Strategy: Concerns about sheep grazing under the solar panels, managing farming on larger sites, and the impact on land quality after 40 years of non-ploughed use.
  • Footpaths: Mixed opinions on new footpaths, with concerns about dogs entering farms and how these paths would be managed.
  • Traffic: Concerns about traffic impact, particularly unloading and the internal track system for vehicles.
  • Site Selection: Criticism of the location’s solar radiation, with suggestions to place the development on hills near wind turbines.
  • Electromagnetic Radiation and Heat Impact: Concerns about misinformation regarding electromagnetic radiation and heat differentials.
  • Visual Impact: Requests for reassurance about mitigation measures like spacing arrays away from properties, and some confusion over the visual impact.
  • Overhead Lines: Concerns about new overhead lines and requests for details on underground cables and their depth.
  • Ecological Impact: Scepticism about the claimed ecological benefits and concerns about wet ground conditions affecting maintenance.
  • Tree Removal: Concerns about the removal of trees near motorways affecting the landscape and visual impact.
  • Tourism Impact: Queries about potential impacts on local tourism, specifically regarding hotels and B&Bs.
  • Community Benefits: Interest in community benefits such as EV charging stations and reduced electricity bills.
  • Battery Storage: High interest in whether battery storage will be incorporated.
  • Sheep Health and Farming Subsidies: Questions about sheep health and whether farmers will still be eligible for Single Farm Payments if they graze sheep under the panels.
  • Construction Noise: Concerns about construction noise, its duration, and how the site will be maintained during wet seasons.
  • Recycling: Queries about the long-term use of panels, efficiency, and the recycling of equipment at the project’s end.
  • House Prices: Questions about the potential impact on house prices.
  • Heat Island Effect: Misinformation about the heat island effect and its relation to solar panels.
  • Consultation Strategy: Criticism of the timing of the consultation, particularly during children’s holidays, and concerns about the accuracy of the letter drop and newspaper choice.
  • Miscellaneous Concerns:
    • Misunderstandings about the decommissioning strategy and future farmability of land.
    • Misinformation regarding the electromagnetic radiation from solar panels.
    • Climate change scepticism and disbelief in renewable energy benefits.
    • Concerns over CCTV installation and its impact on privacy.
    • Doubts about the grade of land being used.
    • Confusion over why the solar panels are not placed on buildings or car parks.
    • Suggestions to expand or shift the development to other areas.
    • Offers of additional land from locals.
    • Potential mental health impacts due to uncertainty around the project.

Display Boards

We are pleased to announce that BBC Radio Dumfries, Dumfries & Galloway Standard, D&G Online, and Greatest Hits Radio Dumfries & Galloway covered the Wysebyhill Energy Farm consultation event, helping to inform and engage the local community.

Subject to approval, we will be linking the radio clip from BBC Radio Dumfries in the news section of our website, so stay tuned for updates. This media coverage has been invaluable in highlighting the importance of the project and encouraging local participation in the consultation process.


Community Engagement – Winter 2025

During winter 2025, GEI undertook a programme of early, face-to-face engagement with a number of local residents who had raised concerns about the emerging proposals.

Where requested, meetings were held at residents’ properties, or alternatively at neutral locations where this was preferred. These meetings provided an opportunity for detailed discussion in a smaller setting.

During these discussions:

  • Views from properties were considered on site.
  • Photographs were taken to help understand specific viewpoints.
  • Emerging design changes were explained as they were being developed.
  • Residents were able to comment directly on how proposals might affect them.

Feedback from these meetings has helped to inform and shape the evolving design, alongside technical assessment and wider public consultation.

This early engagement formed part of the project’s pre-application approach and has been followed by the wider public consultation programme described below.


Scoping Submission – December 2025

In December 2025, a formal Scoping Submission was made for the Wyseby Hill Energy Farm. This marks an early but important step in the statutory assessment process.

The purpose of the scoping stage is to agree the scope and level of detail required for the Environmental Impact Assessment (EIA). It allows consultees to comment on:

  • Which environmental topics should be assessed.
  • The extent of those assessments.
  • The proposed assessment methodologies.

No final design decisions are made at this stage.

Where the Scoping Submission Can Be Viewed

The Scoping Submission is publicly available and can be viewed online at the following locations:

  • Dumfries and Galloway Council Planning Portal
    The application is live on the Council’s planning portal, where submitted documents and consultee responses can be accessed. Link
  • Scottish Government Energy Consents Unit (ECU)
    The submission is also available via the Energy Consents Unit website, which manages nationally significant energy infrastructure applications in Scotland. Link

These platforms provide transparency and allow statutory consultees, stakeholders, and members of the public to view the scoping information.

Relationship to Consultation

The scoping process runs alongside pre-application consultation. Feedback received through public engagement helps to inform how potential effects are understood and assessed, alongside technical and statutory requirements.

Consultation on the project is ongoing, and further opportunities to comment are provided as the proposals continue to evolve.


Ongoing Consultation and Engagement – Spring 2026

Consultation on the Wyseby Hill Energy Farm is being carried out through a series of staged public events, supported by a range of notification methods to ensure local communities and stakeholders are aware of opportunities to take part.

The project remains at the pre-application stage, and consultation is ongoing.

How We Are Consulting

Public consultation is being undertaken through a combination of in-person events, direct notification, local advertising, and online communication.

Following the initial consultation event held in Gretna in January 2026, further consultation events are planned before any planning application is submitted.

Ahead of Events 3 and 4, two further letter drops are proposed. These will be sent to the same distribution area of approximately 3,000 local addresses as the initial consultation, ensuring households have more than one opportunity to engage as the proposals develop.

How People Are Being Notified

A range of methods is being used to notify people about consultation opportunities.

Direct Notification

  • Letter drops to approximately 3,000 local addresses, repeated ahead of later events.
  • Email invitations sent to over 50 individuals who attended earlier events or requested to be kept informed.

Local Advertising and Online Promotion

  • Consultation events are advertised in local newspapers and listed on the Public Notice Portal.
  • Updates and event information are shared via the project’s Facebook account.
  • Local community groups are contacted and asked to share consultation information where possible.

Stakeholder and Elected Representative Engagement

  • Invitations have been issued to local councillors, Members of Parliament, and other identified interested parties.
  • This ensures elected representatives and key stakeholders are aware of the consultation process and emerging proposals.

Purpose of the Ongoing Approach

The consultation strategy is intended to:

  • Provide multiple opportunities to engage across different stages of the project.
  • Allow feedback to be given as the design evolves.
  • Ensure consultation is accessible to residents, stakeholders, and the wider community.

Feedback received through consultation continues to inform the development of the proposals and the approach to future event

Sample of Flyers


Summary of Consultation Event 2

Consultation on the Wyseby Hill Energy Farm is being carried out through a series of staged public events, supported by a range of notification methods to ensure local communities and stakeholders are aware of opportunities to take part.

The second consultation event was attended by approximately 10–20 local councillors. In addition, around 50–100 members of the public visited the event and spoke with members of the project team.

Engagement took place primarily through informal, drop-in discussions, allowing attendees to raise questions and comment directly with staff. A small number of written questionnaires were completed, and project team members recorded a series of comments and suggestions during conversations on the day.

Feedback Received

Feedback covered a range of topics, including:

  • Suggestions on how consultation is carried out, including event format, clarity of information, and accessibility.
  • Comments on how information is presented, particularly the need for clearer location context, better labelling of zones and nearby settlements, and reduced reliance on large amounts of written text on display boards.
  • Requests for clearer explanation of how the design has evolved, including where mitigation has been applied and why.
  • Interest in seeing clearer information on community benefit proposals at future events.
  • Material planning considerations, including suggestions for changes to elements of the proposals and concerns relating to specific locations, such as land close to major infrastructure.

Lessons Learned and Actions

From feedback received at Event 2 and earlier consultation activity, a number of lessons have been identified. In response, the project team is:

  • Improving overview and zonal mapping, including clearer identification of villages, zones, and key infrastructure.
  • Reducing the amount of text on display boards, with more detailed information made available separately.
  • Providing clearer explanation of design changes and mitigation measures applied to date.
  • Introducing more focused themes for future events, including dedicated information on community benefits.
  • Continuing to use a drop-in format, while keeping alternative engagement options under review where requested.

Follow-Up and Ongoing Engagement

A small number of follow-up emails were received after the event. The project team has responded to as many of these as possible, providing clarification and additional information where requested.

Consultation remains open and ongoing. Feedback and input continue to be welcomed as the proposals are refined ahead of any planning application, and comments received to date are being considered alongside technical assessment and feedback from future consultation events.


Summary of Consultation Event 3

Wyseby Hill Energy Farm Consultation Event 3: 2nd March 2026 The third pre-application consultation event was held on Monday 2nd March 2026 at Smith’s Hotel, Gretna, with approximately 60 attendees, including a Member of the Scottish Parliament. The project team presented revised proposals, updated layout plans, and further design information, alongside a dedicated handout outlining community benefit options.

Main themes raised

  • Landscape and visual impacts: Concerns were raised regarding visual effects and the relationship of the proposals to historic landscape corridors.
  • Traffic and access: Questions focused on construction traffic, abnormal loads, and emergency vehicle access arrangements.
  • Ecology and land use: Feedback included concern about peat and carbon-rich soils, together with questions about wildlife sensitivities across Areas 6 to 8.
  • Community benefit and local economy: There was continued interest in options for direct support to local households, the creation of a locally controlled community fund, and potential effects on the local economy and jobs.
  • Detailed layout matters: Attendees also queried specific aspects of the red line boundary and Zone 12 which contains a proposed underground cable route and Zone 5 which is empty appart from any proposed future underground cable route.

Project team response

  • We presented recent design modifications made in response to earlier feedback, which were generally well received by attendees.
  • We reiterated that no final decisions have been made on the community benefit package, which will depend on the final project scale and viability.
  • To help strengthen the project’s socio-economic case and refine the community benefit offer, we also introduced our specialist socio-economic advisers at this stage.

We are dedicated to keeping you informed every step of the way. If you have any questions or require further information, please do not hesitate to contact us.


Thank you for your interest in the Wyseby Hill Energy Farm.