At Green Energy International (GEI), we are developing the Wyseby Hill Energy Farm, a project designed Key Project Components:
Technology and Lifespan: The proposal is for a 40-year operational life, after which the site will be fully decommissioned and returned to its previous state, allowing the soil to recover. Panel heights will be restricted to a maximum of 3.5m (for fixed tilt) or 4.5m (for tracker panels).
Project Scale: The project is designed to deliver up to 1 GW generation with a 750 MWac export cap to the National Grid.
Grid Connection: Electricity generated will connect to the National Grid via a new 400 kV substation at Wyseby Hill.
Future energy connections: We are also considering the feasibility of a secondary underground private wire connection that could supply surplus green power to the adjacent Chapel Cross Green Energy Hub.

Design Parameters and Environmental Mitigation:
Following initial surveys and community feedback, strict design parameters have been established to protect local amenity and heritage:
- Residential Buffers: A minimum 65-metre buffer zone will be implemented between the solar panels and nearby residential boundaries.
- Watercourse Buffers: A minimum 8-metre buffer will be maintained along all watercourses.
- Heritage Protection: The Whinnyrig Scheduled Monument and areas of Ancient Woodland are classified as absolute exclusion zones and will not be built upon.
- Land Use: The site avoids Prime Agricultural Land (Grades 1 to 3.1). The land will remain in agricultural use during operation, allowing for sheep grazing beneath and between the panels.
Traffic and Access: We recognise that construction traffic is a primary concern for local residents. A critical logistical shift has been made regarding site access. The original proposal to utilise the existing Wyseby Hill farm track has been abandoned. Construction routing is now being developed around the Langshaw Burn and A74(M) approach in order to reduce impacts on nearby villages and sensitive local roads.